Logo
Submit a request
Sign in
  1. motivity.net
  2. Collecting and Viewing Data
  3. Reports and Charts

Articles in this section

  • Hide Indeterminate Sessions on Graphs
  • Bulk Export of Charts (beta feature)
  • How to Add Trendlines
  • Event Lines vs. Phase/Condition Lines
  • Y-Axis Options
  • Graphing Rate (Toggle Feature)
  • Split Graph by Staff/Data Collector
  • Accessing Cumulative Graphs
  • Accessing Simulated Graphs
  • See history of a program (when created, library source and who and when last edited)
See more

Hide Indeterminate Sessions on Graphs Follow

Motivity allows you the option to hide indeterminate sessions from graphs easily. An indeterminate session is one that is not working toward or away from the mastery criteria. Commonly, indeterminate sessions occur when the set minimum opportunities were not met during a session. You can also create specific criteria for indeterminate sessions in the program builder. 

 

To hide or show indeterminate sessions on a graph: 

1. Below the graph, click on "Other Options" 

2. Uncheck or check the box labeled "Indeterminate Sessions" 

3. Indeterminate sessions will be removed if the box is unchecked. Indeterminate sessions are denoted with a black data point. 

4. Your settings for indeterminate sessions will stick on the changed graph until you change it back. 

 

2023-08-15_11-14-43.png

 

2023-08-15_11-16-13.png

Created: 8/15/23

  • Facebook
  • Twitter
  • LinkedIn
Was this article helpful?
0 out of 0 found this helpful
Have more questions? Submit a request
Return to top

Related articles

  • Accessing Session Notes
  • Geolocation on Notes

Copyright © motivity.net. All rights reserved.

Zendesk Theme Designed by Diziana